The SafeHouse Hot Work Habitat > Installation

Speed of Installation

The basic habitat can be installed by one technician in a few hours. The habitat can be up and running with integrity proved in accordance with the operating specification.

Similarly the habitat can be moved from installation one to another very quickly contributing to the project schedule.

Another important feature is that an in-situ Safehouse can be "flat packed" in minutes when it becomes necessary, this has occurred in the case of severe weather warnings; the habitats were safely dismantled and re-installed with the minimum of impact to the project schedule.

A case in point was when hurricane Ivan swept over the Carribean Sea, the habitats which were installed offshore were dismantled and flat packed in the matter of a couple of hours then re-inflated when the storm had passed through, causing minimum disruption to the project schedule.

Habitat Installation
Installation on production platform


Installation
Installation around area for hot working
 
SafeHouse Habitats - no flash image